Time is Running out!!! Call us to learn about Investment Tax Credits for your project
Time is Running out!!! Call us to learn about Investment Tax Credits for your project
NgenX Energy approaches Data Center resiliency with a unique application of on-site power generation, thermal recovery and chilled water generation through absorption cooling, or for large applications, steam driven chilling. Leveraging waste heat from the generation initiative, our approach to resiliency ensures 5 "nines" reliability while providing redundant cooling capability under an energy as a service model. With potential for no up front capital, our approach reduces operations costs by up to 35% while providing a higher degree of reliability and resiliency and a path for expansion that supports the current rapid industry growth.
Further enhancing the value proposition is rapid deployment of generation technologies. With power at an absolute premium, the ability to bring your data center on line quickly pays a high dividend. Under a modular approach, power becomes available months, if not years, ahead of current utility expectations and utilizing waste energy to provide IT cooling increases effective IT load availability by over 30%. Your 5MW data center is really 5MW of IT load, not 3MW of IT load and 2MW of cooling and ancillary consumption.
Maximize your capacity and minimize your time to market with Innovation from NgenX.
NgenX Data Center Overview Presentation
Copyright © 2024 NgenX Energy - All Rights Reserved.
Powered by GoDaddy
As NgenX Expands our solutions to support the explosion of data center activity, we have formed a strategic alliance with Kais AIR, a leader in the design, engineering and fabrication of modular industrial solutions. Fully fabricated 1MW, 3MW and 6.4MW data center modules, Fully Powered and ready to operate on or off the grid using redundant, gas fired primary generation with thermal recovery for cooling. Substantially reduce PUE while accelerating time to market. We bring the power to you NOW!